CIDCO Conventional Center Mumbai

About the project

Client:

CIDCO Conventional Center

Installed Plant:

1 Megawatt

Project Location:

Vashi Mumbai

Generation:

  1. The project is
  2. expected to save 120,000 units of energy
  3. consumption from grid, delivering an annual
  4. electricity bill savings of ₹19.02 million (~$217,298),
  5. with a payback period of roughly 2.5 years.